
05/26/10 - Endpoint proud supporter of the Leukemia Research Foundation
05/03/10 - Endpoint awarded engineering contract for major chemical facility design
03/11/10 - Endpoint awarded VA contract

|
Project Descriptions
Endpoint Solutions' staff has successfully managed numerous projects ranging from small site assessments to multi-million dollar brownfield investigations and remediations.
U.S. Army Base Realignment & Closure Site, Texarkana, Texas
Endpoint staff planned and performed site characterization activities on over 15,000 acres of a base realignment and closure (BRAC) site as part of a cooperative effort between the Army and local redevelopment authority.
Former Manufacturing Site, Kenosha, Wisconsin
Endpoint staff planned, managed and oversaw demolition activities, sampling, remediation, and long term groundwater monitoring as part of a third party liability transfer of this 27-acre brownfield site.
Former Manufacturing Site, Lisbon, Maine
Endpoint staff managed and performed a wide range of activities at this defunct manufacturing site including demolition, groundwater treatment system relocation and optimization, soil investigation and remediation, and sediment dredging of the nearby river.
PECFA Sites, Numerous Locations, Wisconsin
Endpoint staff have managed and performed a wide range of activities at PECFA sites ranging from simple investigations of small former gas station sites to remediation of and obtaining closure at large bulk fueling facilities.
Industrial Sites, Multiple Sites, Pennsylvania & New Jersey
Endpoint staff assisted the client with obtaining regulatory closure at several of their facilities (former and current) through a review of work performed at the site to date, providing recommendations for and performing additional investigative activities to complete any data gaps found, and application for closure to the local regulatory agencies.
Chemical Manufacturing Facility, Saukville, Wisconsin
Endpoint staff performs the long-term groundwater monitoring and reporting activities for the facility as well as assists the facility with compliance related to stormwater discharges and public relations and community advisory committee meetings.
Automotive Parts Manufacturer, Multiple Sites, Wisconsin
Endpoint staff assists the client with regulatory compliance audits as well as sampling for discharge permit requirements. Endpoint staff have also performed a number of subsurface investigations and remedial projects for the client at a number of their facilities throughout the state.
Pipeline Terminals, Multiple Sites, Wisconsin
Endpoint staff perform the assessment, investigation, remediation and regulatory interaction related to recent and historical petroleum product releases at a client’s terminals. Additional work has included storm water compliance, management and design.
Groundwater Monitoring Sites, Fort McCoy, Wisconsin
Endpoint performed the quarterly groundwater sampling, monitoring and analysis at seven areas within the 60,000 acre Fort McCoy installation. All groundwater monitoring was performed utilizing EPA approved low flow sampling techniques.
|